Everything your team needs to manage snags clearly.
SnagCore covers the full snagging process: capturing issues with photographs on site, assigning them to the right trade, tracking them through to completion, verifying the fix and exporting a report your client can read.
Capture what you find, while you are standing in front of it
- Photo-first snag capture
- Take or upload a photograph as part of logging the issue. Photographs are stored privately against the snag, so the evidence and the description never get separated in a chat thread.
- Voice input for descriptions
- Dictate the description instead of typing with gloves on. Useful when you are walking a floor and logging one item after another.
- Floor plan pinning
- Drop a pin on an uploaded floor plan so the trade knows exactly which door, window or wall you meant, rather than guessing from a room name.
New snag
Riverside CourtIssue title
Description
Priority
Category
Building
Floor
Room
Assignee
Tom FitzgeraldDue date
Photos

Organise the list so nothing gets lost
- Snag lists per project
- Every snag belongs to a project and carries a location, category and priority, so a 300 item list stays readable and can be worked through room by room or trade by trade.
- Search and filtering
- Find any issue by keyword, status or priority. Handy when a contractor rings and asks what is still outstanding for them.
- Templates
- Start an inspection from a reusable checklist template instead of rebuilding the same list of standard checks on every unit.
Snags
Riverside Court · 42 items
Open
18
In progress
11
Complete
9
Overdue
4
HighopenSeal gap around window frame
Painter · Apt 204 · due 14 Mar
Mediumin progressSocket faceplate misaligned
Electrician · Apt 106 · due 12 Mar
HighoverduePaint finish incomplete
Painter · Hall 2F · due 09 Mar
LowopenScratched kitchen cabinet door
Contractor · Apt 311 · due 18 Mar
MediumcompleteBathroom silicone requires finishing
Plumber · Apt 208 · due 07 Mar
Assign work and keep ownership clear
- Assignment to trades
- Each snag records who is responsible, their trade role and a due date. Overdue items are counted on the dashboard so they surface before handover week.
- Roles and permissions
- Access is role based. Contractors see the contractor view of work assigned to them, while owners and managers keep the full project picture.
- Notifications
- In-app notifications flag changes that matter to you, instead of a group chat where every message reaches everybody.
Socket faceplate misaligned
Riverside Court · Snag #148

Ciaran Walsh
Electrician · assigned 6 Mar
Location
Block A · Level 1 · Apt 106
Due
12 Mar 2026
Priority
Medium

Work on site, signal or not
- Inspection mode
- Walk a unit and step through items one at a time, recording results as you go rather than writing them up afterwards.
- Offline working
- If the connection drops, new snags are queued on the device and sent automatically once you are back on signal. An indicator shows when you are offline.
- Mobile-first interface
- The layout is designed for phones on site: large tap targets, short forms and the camera one tap away.
Inspection
Apt 204
Seal gap around window frame
Apt 204openSocket faceplate misaligned
Apt 106in progressPaint finish incomplete
Hall 2FoverdueScratched kitchen cabinet door
Apt 311open
Verify the fix and prove it
- Before and after photographs
- Compare the original issue with the completed work using a side by side slider, so sign-off is based on evidence rather than a verbal assurance.
- Status tracking
- Snags move through open, in progress and complete, with the completion date recorded automatically when an item is closed.
- Sign-off and handover view
- A handover view brings the outstanding and completed work together with a signature pad for the walkthrough.
Seal gap around window frame
Block B · Level 2 · Apt 204



Tom Fitzgerald
Painter · completed 13 Mar 2026
Report to clients and close out
- PDF reports
- Export a report built from the live snag data, with photographs and statuses included, ready to send to a client or main contractor.
- Custom branding
- Pro and Team plans add your logo and colours to exported reports so the document looks like it came from your company.
- Project analytics
- See open, in progress and completed counts, overdue items, completion trend and the breakdown by priority for each project.
Snagging report · 15 Mar 2026
Riverside Court, Block B
Total snags
42
Complete
29
In progress
9
Open
4
completeSeal gap around window frame
Apt 204 · Tom Fitzgerald
overduePaint finish incomplete
Hall 2F · Tom Fitzgerald
in progressSocket faceplate misaligned
Apt 106 · Ciaran Walsh
Page 1 of 6 · generated from live snag data